On March 6th, Richie and I flew down to Seattle and met Frankie
flying up from Florida. We spent until the 14th reviewing the
progress of the boat, and getting the final contract to finish the boat
done. The boat at this time had the primer coats of paint on, and
work was progressing to get the last few problem areas cleaned up
before the final topcoat went on. Naturally we took a bunch of
pictures, which follow...
1.
The starboard side of the boat. The blue-ish tinge is the non-skid base.
2.
The new sugar scoup/aft end of the boat.
3.
Aft end of the boat. The blue-ish tinge is the non-skid base.
4.
Fred is hard at work, sanding in the cotpit.
5.
Roof of the main cabin; The blue-ish tinge is the non-skid base.
6.
Topsides of the Acrux. The blue-ish tinge is the non-skid base.
7.
Frontal area of the boat. The tarp overhead is to keep the condensation off the boat.
8. Sanding on the boaw of the boat. The blue-ish tinge is the non-skid base.
9.
Port side of the boat, looking aft.
10.
Port side of the boat, looking forward.
16.
Aft starboard side of the boat.
That's all the photos we have of Acrux this time!!